Contracts
Awarded Contracts
Contract Number | Title | Date of Award | Awarded To | Contract Amount ex. GST | Contract Period |
CON/403 | Leongatha Memorial Hall Precinct Feasibility Study | 24/06/2024 | Wendy Dunstan, T/A Outside the Square Creative Consulting | $261,465.92 | 45 weeks |
CON/398 | Mount Lyall Road, Nyora – Road Rehabilitation | 20/06/2024 | Sure Constructions (Vic) Pty Ltd | $1,789,338.44 | Practical Completion Due 30 November 2024 |
CON/393 | Great Southern Rail Trail; Manufacture, Supply and Install Signage between Nyora and Yarram | 04/06/2024 | Hugh Patrick Pty Ltd T/A BJs Earthmoving | $406,380.00 | 30 weeks |
CON/395 | Meeniyan and Poowong Stadiums Re-Roofing Projects | 19/04/2024 | Allchin Commercial Pty Ltd T/A Allchin Builders | $350,456.38 | 30 weeks |
CON/402 | Building Maintenance Services | 06/05/2024 | McLeod, Dowel & Courtney T/A MDC Building Group | Schedule of Rates | 3 years + 1-year extension available |
CON/397 | Shingler Street Leongatha Road Rehabilitation | 21/03/2024 | Hugh Patrick Pty Ltd T/A BJs Earthmoving | $408,417.03 | 12 weeks |
CON/390 | Construction of Retaining Wall, 18 Smith Street Loch | 22/01/2024 | A1 Civil Pty Ltd | $155,027.09 | Practical Completion due 1 March 2024 |
CON/378 | Korumburra Commercial Street Streetscape – Civil Construction | 03/01/2024 | Hugh Patrick Pty Ltd T/A BJs Earthmoving | $1,993,903.31 | 40 weeks |
CON/373-A | Design & Construct Landslips Repair, Various Locations – Package A; Project 3 – Grand Ridge Road (Site 1), Trida (Hallston) and Project 4 – Grand Ridge Road (Site 2), Trida | 21/12/2023 | Fulton Hogan Industries Pty Ltd | $3,418,556.70 | 31 March 2024 |
CON/377 | Design & Construct Public Amenities and Shelters at Korumburra and Leongatha Railway Precincts | 5/12/2023 | GR Design & Construct Pty Ltd | $1,061,520.60 | Practical Completion due 18 July 2024 |
CON/387 | Leongatha Municipal Office Redevelopment -Exterior Refurbishment | 12/12/2023 | McLeod, Dowel and Courtney Pty Ltd T/A MDC Building Group | $988,954.18 | 24 Weeks |
CON/383 | Black Spot Funding – Koonwarra-Inverloch Road Intersection Reconstruction | 22/11/2023 | Fowlers Asphalting Pty Ltd | $408,525.39 | 16 weeks |
RFT/373-B | Design and Construct Repair of Landslips, Various Locations - Sanders Road Korumburra and Main South Road Poowong East | 10/11/2023 | Fulton Hogan Industries | $3,729,232.04 | 31 March 2024 |
CON/384 | Minor Drainage Works Korumburra & Leongatha | 31/10/2023 | ACE Earthmoving (Vic) Pty Ltd | $194,067 | 8 weeks |
CON/365-A | Management & Operation of Selected Aquatic Venues | 24/10/2023 | Victorian YMCA Community Programming Pty Ltd | $3,003,139.00 | 3 years + two one-year extensions available |
RFT/380 | Provision of Bituminous Surfacing & Associated Services | 10/10/2023 | Primal Surfacing Pty Ltd | $1,686,021.73 | 30 April 2024 |
RFT/373-C | Design and Construct Repair of Landslips, Various Locations - Nippards Track and Popes Road | 6/10/2023 | Earthtec Pty Ltd | $1,311,100.00 | 31 March 2024 |
CON/369 | Construction of Cell 5; Koonwarra Landfill | 6/10/2023 | Goldsmith Civil & Environmental Pty Ltd | $1,997,783.45 | 25 weeks |
CON/372 | Koonwarra Landfill Cell 5 - Provision of Environmental Auditing, GITA and Third Party CQA Services | 4/10/2023 | Bajwa EnviroConsult Pty Ltd | $114,850 | 25 weeks |
CON/365-B | Management and Operation of Selected Aquatic Venues within South Gippsland: Toora & Foster Outdoor Pools | 18/09/2023 | EC & CA Bennett | $776,605 | 3 years + two one-year extensions available |
CON/349 | Korumburra Bena Football Netball Changerooms Project | 30/08/2023 | Beachley Constructions Pty Ltd | $1,442,900 | Practical completion due 6 September 2024 |
CON/357 | Construction of Meeniyan Community Hub | 29/08/2023 | TS Constructions Pty Ltd | $1,933,000 | 40 weeks |
CON/367 | Preparation of Waste and Resource Recovery Plan | 27/06/2023 | Mike Ritchie & Associates Pty Ltd T/A MRA Consulting | $61,809.00 | 26 weeks |
CON/371 | Management & Cleaning of Leongatha Memorial Hall Complex | 23/06/2023 | Guardian Facilities and Property Management | $98,900 | 3 years + two one-year extensions available |
CON/366 | Panel of Civil and Road Surfacing Works, Equipment & Products | 23/06/2023 |
Panel Contract – 12 suppliers
|
Schedule of rates | 3 years + two x one-year extensions available |
CON/216 | Provision of Linemarking Services (Re-tendered) | 29/05/23 | Tarmac Linemarking Pty Ltd | Schedule of Rates | 3 years + 2 x 1 year extensions available |
CON/356 | Venus Bay Tourism Precinct | 17/05/23 | Hugh Patrick Pty Ltd T/A BJs Earthmoving | $1,717,304.62 | 21 weeks |
CON/361 | Korumburra Rail Precinct Carpark; Stage 1 | 30/03/2023 | All Waste Solutions Pty Ltd trading as AWS Civil | $725,615.00 | 16 weeks |
CON/353 | Design, Supply and Install Electric Vehicle Charging Stations Across South Gippsland | 22/03/2023 | RACV Solar Pty Ltd | $532,359.03 | 20 weeks |
CON/351 | Design and Construct New Toilet Block; Baromi Park Mirboo North | 16/03/2023 | Landmark Engineering and Design, Trading as Modus Australia | $317,261.00 | 20 weeks |
CON/343 | Construction of Retaining Wall; Mirboo North Transfer Station | 24/02/2023 | Hugh Patrick Pty Ltd T/A BJs Earthmoving Pty Ltd | $603,953.65 | 12 weeks |
CON/346 | Construction of Mirboo North Swimming Pool Carpark | 23/12/2022 | ACE Earthmoving (VIC) Pty Ltd | $474,910.60 | 16 weeks |
CON/348 | Sealed Roads Rehab | 21/12/2022 | Sure Constructions (Vic) Pty Ltd | $1,624,273.35 | 12 weeks |
CON/344 | Simons Lane Leongatha; Road Reconstruction | 21/12/2022 | Hugh Patrick Pty Ltd T/A BJs Earthmoving | $1,203,943.80 | 16 weeks |
CON/340 | Leongatha Early Learning Centre; Carpark Extension | 20/12/2022 | ACE Earthmoving (Vic) Pty Ltd | $391,145.60 | 12 weeks |
CON/336 | Supply and Installation of Guardrails - Blackspot Program - Various Locations | 19/12/2022 | Safety Barrier Solutons Pty Ltd | $195,435.00 | 8 weeks |
CON/339 | Construction of Skate Park Venus Bay | 5/12/2022 | Precision Skate Parks Pty Ltd | $190,530.00 | 16 weeks. |
NPN2.15-2 | Heavy Plant Machinery Equipment - 4WD Articulated Front End Loader | 28/11/2022 | JCB Construction Australia Pty Ltd | $292,900.00 | 10 months |
NPN2.15-2 | Heavy Plant Machinery Equipment - Motor Grader with Rear Mounted Roller Attachment | 24/11/2022 | Williams Adams Australia Pty Ltd | $590,500.00 | 10 months |
CON/313 | Jones Street, Foster; Street Reconstruction | 7/11/2022 | Hugh Patrick Pty Ltd T/A BJs Earthmoving Pty Ltd | $534,752.66 | 12 weeks |
CON/333 | Construction of Footpath Extensions | 20/10/2022 | M & M Paving | $194,942.08 | 27 weeks |
CON/331 | Road Realignment – Gardner Lane Poowong 3988 | 4/10/2022 | Sure Constructions (Vic) Pty Ltd | $224,381.39 | 8 weeks |
CON/332 | Design & Construction of Pedestrian Bridge and Elevated Walkway at Leongatha Rail Precinct | 30/09/2022 | South Gippsland Quarries Pty Ltd | $657,800 | 40 weeks |
CON/335 | Design & Construct Oval Reconstruction at Foster Showgrounds | 27/09/2022 | A1 Civil Pty Ltd | $444,475.55 | 20 weeks |
CON/330 | Design & Construction of AFL Sports Floodlighting at Four Locations | 27/09/2022 | ACE Earthmoving (VIC) Pty Ltd | $946,700 | 26 Weeks |
NPN04-13 | Trucks - Plant Purchase - 26t GVM Heavy Rigid Sealed Road Maintenance Truck |
21/09/2022 |
Patterson Cheney | $445,335 | 18 months |
CON/259 | Panel of Suppliers for Supply & Delivery of Quarry Products and Road Making Materials |
1/09/2022 |
Panel Contract – 1 supplier
|
Schedule of Rates | 1 year |
CON/258 | Panel of Dry Hire of Plant and Equipment Suppliers |
1/09/2022 |
Panel Contract – 2 suppliers |
Schedule of Rates | 1 year |
CON/256 | Panel of Civil Works, Plant Hire and Haulage |
1/09/2022 |
Panel Contract – 3 suppliers |
Schedule of Rates | 1 year |
CON/328 | Design, Supply and Installation of Solar Photovoltaic (PV) Systems | 17/08/22 | RACV Solar Pty Ltd | $103,835.92 | 17 weeks |
CON/324 | Leongatha Municipal Office Refurbishment | 25/07/22 | Beachley Constructions Pty Ltd | $1,392,800.00 | 30 weeks |
CON/317 | New Foster Depot Building Refurbishment Project | 11/05/22 | Considine and Johnston Pty Ltd | $370,114.68 | 24 weeks |
CON/321 | Supply and Installation of Guardrail - Various Locations | 29/04/22 | Safety Barrier Solutions | $338,176.00 | PC on 29 July 2022 |
CON/319 | Timms Road, Poowong North - Intersection Reconstruction | 29/04/22 | Hugh Patrick Pty Ltd t/as BJ's Earthmoving | $442,392.53 | PC on 29 July 2022 |
CON/308 | Carpark Construction- Leongatha Rail Yards | 06/04/2022 | South Gippsland Quarries Pty Ltd | $1,362,334.36 | 30 weeks |
CON/314 | Port Welshpool Boat Ramp Parking Facility Enhancement Project | 21/03/22 | Hugh Patrick Pty Ltd t/as BJ's Earthmoving | $1,189,285.18 | 16 weeks |
NPN04-13 | Provision of New Trucks | 16/02/22 | CVM Truck & Bus Gippsland | $268,247.10 | N/A |
CON/310 | Provision of Transfer Station Hook Lift Bins | 05/01/22 | EasyQuip Pty Ltd | $225,528.00 | 20 weeks |
CON/309 | Pavement Rehabilitation - Mount Eccles Road | 15/12/21 | Downer EDI Works Pty Ltd | $375,323.75 | 8 weeks |
CON/312 | Energy Efficient Street Lighting Bulk Replacements | 15/12/21 | Magnetic Power Services | $321,701.00 | PC on 31 May 2022 |
CON/307 | Streetscape Redevelopment - Little Commercial Street Korumburra | 24/11/21 | ACE Earthmoving (Victoria) Pty Ltd | $1,655,477.70 | 40 weeks commencing Jan 2022 |
CON/302 | Construction of Footpath Renewals and Footpath Extensions | 15/09/21 | Hugh Patrick Pty Ltd t/as Bj's Earthmoving | $458,754.20 | PC on 29 April 2022 |
CON/299 | Provision of Bituminous Surfacing & Associated Services | 18/08/21 | Fulton Hogan Industries Pty Ltd | $1,579,931.42 | 1 year |
CON/291 | Provision of Transfer Stations Management and Booked Hard Waste Collection Services |
15/09/21 | Dasma Environmental Pty Ltd | Annual Supply | 7 years |
CON/296 | Construction of Leongatha Early Learning Centre | 15/09/21 | Kubale Construction Pty Ltd | $4,869,120.00 | 60 weeks |
LP20091 | Light Plant Machinery and Equipment | 15/09/21 | Chapmans Machinery Leongatha | $255,000.00 | N/A |
CON/290 | Korumburra Hub Datacentre | 18/08/21 | Perfekt Pty Ltd | $285,746.00 | 70 weeks |
CON/287 | Replacement of Roof Cladding to Leongatha Stadium and Leongatha Memorial Hall | 21/07/21 | May Constructions Pty Ltd | $518,800.00 | 40 weeks |
CON/267 | Construction of the Korumburra Community Hub | 21/07/21 | 2Construct Pty Ltd | $5,643,816.00 | 70 weeks |
SL3911 | Energy Efficient Street Lighting Hardware & Installation Services | 21/07/21 | Schreder Australia | $638,959.75 | N/A |
AGRN 969 | Emergency Event AGRN 969 McCartins Road Turtons Creek Slip Repairs | 14/07/21 | Regional Roads Victoria | $266,980.00 | N/A |
CON/284 | Provision of HVAC Maintenance Services - 2021 to 2024 | 16/06/21 | William and Burns Contracting Pty Ltd | Schedule of Rates | 3 years |
SGC15/08 | Management and Operation of Selected Aquatic Venues | 19/05/21 | YMCA | Non-guaranteed net result (actual cost) | 2 years |
CON/282 | Laptop Fleet Replacement | 18/04/21 | Computer Systems Australia | $218,000.00 | N/A |
CON/283 | Provision of Cleaning Services - Various Office Sites | 19/05/21 | Peopleworks Cleaning Services Pty Ltd | Schedule of Rates | 3 years |
CON/279 | Great Southern Rail Trail Extension - Design and Construction of Pedestrian Bridges - Leongatha to Nyora | 24/02/21 | Agtrans Services | $1,159,596.00 | 32 weeks |
CON/275 | Repair of Two Landslips in the South Gippsland Region | 16/12/20 | MACA Civil Pty Ltd | $249,765.87 | 10 weeks |
CON/273 | Major Culvert Replacement Boundary Road Foster | 16/12/20 | ACE Earthmoving Pty Ltd | $693,367.13 | 14 weeks |
CON/271 | Great Southern Rail Trail Extension - Construction of a Gravel Trail - Leongatha to Nyora | 16/12/20 | MACA Civil Pty Ltd. | $2,080,000 | 40 weeks |
CON/270 | Foster Indoor Stadium Redevelopment | 16/12/20 | Becon Constructions Aust. Pty Ltd | $2,047,556.00 | 36 weeks |
CON/268 | Laptop Fleet Replacement | 11/11/20 | Computer Systems (Australia) Pty Ltd | $172,656.00 | 8 weeks |
RFT/264 |
Construction Of Footpath and Kerb & Channel Renewals and Footpath Extensions |
23/09/2020 |
M&M Paving Formplus Concrete Constructions Pty Ltd MACA Infrastructure Pty Ltd |
$265,580.90
$137,508.47
$53,709.77 |
9 months |
RFT/265 |
Bena Kongwak Road, Bena, and Ferrier Street, Korumburra - Reconstruction | 23/09/2020 | South Gippsland Quarries Pty Ltd | $320,395.90 | 14 weeks |
CON/248 | Landslip repairs – various sites | 16/09/20 |
MACA Infrastructure P/L (2 sites) South Gippsland Quarries (3 sites) Hugh Patrick P/L (2 sites) |
$1,296,460.00
$591,141.00 $576,635.00 |
10 weeks
10 weeks 14 weeks |
CON/261 | Poowong Tennis and Netball Court Redevelopment | 26/08/20 | ACE Earthmoving Pty Ltd | $358,276.60 | 16 weeks |
CON/257 | Streetscape Redevelopment – Bair Street Leongatha | 26/08/20 | Hugh Patrick Pty Ltd T/A BJ'S Earthmoving | $3,210,318.79 | 40 weeks |
CON/255 | HRIS - Learning and Development Software | 26/08/20 | Ascender PeopleStreme Pty Ltd | $148,640.00 | 3 years |
CON/259 | Panel of Suppliers for Supply & Delivery of Quarry Products and Road Making Materials | 22/07/20 |
Panel contract – 10 suppliers
|
Schedule of Rates | 3 years |
CON/258 | Panel of Dry hire of Plant and Equipment Suppliers | 22/07/20 |
Panel contract – 13 suppliers
|
Schedule of Rates | 3 years |
CON/256 | Panel of Civil Works, Plant Hire and Haulage | 24/06/20 |
Panel contract – 34 suppliers
|
Schedule of Rates | 3 years |
CON/254
|
Management and / or Cleaning of the Leongatha Memorial Hall Complex | 27/03/20 | KC Facility Services Pty Ltd | $142,950.00 | 3 years |
CON/253 | Supply And Installation Guardrails Black Spot Program – Various Locations | 27/05/20 | DDC Pty Ltd | $507,004.27 | 8 weeks |
CON/252 | Provision of Swimming Pool Maintenance Services | 27/05/20 | Mechanical Plumbing Services Pty Ltd | Schedule of Rates | 3 years |
CON/251 | Constructions of Skate Park, Basketball Half Court and Performance Arts Space in Mirboo North | 22/04/20 | Independent Concrete Constructions Pty Ltd | $359,315.00 | 30 weeks |
CON/249 | Construction of Sealed Asphalt Car Park - Toora Pool | 25/03/20 | BJ's Earthmoving | $225,917.00 | 12 weeks |
CON/247 | Jumbunna Road, Korumburra Shared Path Construction | 26/2/20 | A1 Civil Pty Ltd | $715,045.21 | 20 weeks |
CON/246 | Construction of Timms Road Bridge and Associated Roadworks | 26/2/20 | Jarvis Norwood Constructions Pty Ltd | $541,400.00 | 16 weeks |
CON/240 | Geotechnical Investigation and Rehabilitation Design Services for Nine Landslips | 30/9/19 | Geotesta Pty Ltd | $200,692.80 | 20 weeks |
CON/244 | Infrastructure Asset Management Modelling Software | 27/2/20 | Assetic Australia Pty Ltd | $419,150.00 | 4 years |
CON/242 | Design and Construct New Toilet Clocks at Coleman Park, Korumburra and Warratah Bay Caravan Park | 11/2/20 | GR Design and Construct | $238,108.62 | 22 weeks |
CON?243 | Relocation of Electrical Mains and Upgrade of Street Lighting - Bair Street, Leongatha | 27/2/20 | Downer Utilities Australia Pty Ltd | $1,301,732.19 | 6 months |
CON/231 | Mirboo North Pool - Design and Construct and Pavilion Redevelopment | 20/11/19 | Langden Construction Pty Ltd | $5,617,570.00 | 11 months |
CON/235 | Leongatha and District Netball Association Courts Redevelopment | 20/11/19 | BJ's Earthmoving | $648,598.50 | 16 weeks |
CON/238 | Provision of Catering Service | 25/10/19 | Brent Sinclair Catering | Schedule of Rates | 3 years |
CON/236 | Provision of Bituminous Surfacing and Associated Services | 23/10/2019 | Fulton Hogan Industries Pty Ltd | $1,119,771.36 | PC on 30 April 2021 |
CON/234 | Supply & Installation of Guardrails – Various locations | 25/9/19 | Safety Barrier Solutions Pty Ltd | $87,550.00 | Estimated PC 24 April 2020 |
CON/233 | Design & Construction of Toora Swimming Pool Splash Park | 25/9/19 | Water Features by Design | $398,000.00 | 14 weeks |
CON/232 | Construction of Footpath Renewals & Footpath Extensions | 25/9/19 | M & M Paving | $312,133.17 | Estimated PC 26 June 2020 |
CON/229 | Collection, Transport & Disposal of Leachate from Koonwarra Landfill | 25/7/19 | CSA Specialised Services Pty Ltd | Schedule of Rates | 3 years |
CON/227 | Renovation of Fish Creek Kindergarten | 24/7/19 | Considine & Johnston Pty Ltd | $314,542.66 | 15 weeks |
CON/226 | Supply and Delivery of Premixed Concrete | 24/7/19 | Holcim (Aust) Pty Ltd | Annual Supply | 3 years |
CON/222 | Provision of Tree and Vegetation Maintenance Services | 26/6/19 | Arborzone | Annual Suppy | 1 year |
CON/222 | Provision of Tree and Vegetation Maintenance Services | 26/6/19 | Tree Works | Annual Suppy | 1 year |
CON/222 | Provision of Tree and Vegetation Maintenance Services | 26/6/19 | Gippsland Contractor | Annual Supply | 1 year |
CON/222 | Provision of Tree and Vegetation Maintenance Services | 26/6/19 | Gippy Tree Services | Annual Supply | 1 year |
CON/222 | Provision of Tree and Vegetation Maintenance Services | 26/6/19 | GLS | Annual Supply | 1 year |
CON/222 | Provision of Tree and Vegetation Maintenance Services | 26/6/19 | Clean Cut Trees | Annual Supply | 1 year |
CON/222 | Provision of Tree and Vegetation Maintenance Services | 26/6/19 | Ecoprojects | Annual Supply | 1 year |
CON/221 | Concreting Services | 26/6/19 | M & M Paving | Annual Supply | 1 year |
CON/221 | Concreting Services | 26/6/19 | M & HM Whelan | Annual Supply | 1 year |
CON/221 | Concreting Services | 26/6/19 | C & D Earthworks | Annual Supply | 1 year |
CON/221 | Concreting Services | 26/6/19 | BJ's Earthmoving | Annual Supply | 1 year |
CON/220 | Supply/Delivery of Quarry Products and Road Making Materials | 26/6/19 | South Gippsland Quarries | Annual Supply | 1 year |
CON/220 | Supply/Delivery of Quarry Products and Road Making Materials | 26/6/19 | S & LM Riley | Annual Supply | 1 year |
CON/220 | Supply/Delivery of Quarry Products and Road Making Materials | 26/6/19 | K & RJ Matthews Quarries Pty Ltd | Annual Supply | 1 year |
CON/220 | Supply/Delivery of Quarry Products and Road Making Materials | 26/6/19 | Kennedy Haulage Pty Ltd | Annual Supply | 1 year |
CON/220 | Supply/Delivery of Quarry Products and Road Making Materials | 26/6/19 | Holcim (Aust) Pty Ltd | Annual Supply | 1 year |
CON/220 | Supply/Delivery of Quarry Products and Road Making Materials | 26/6/19 | Goldsmith Civil & Environmental | Annual Supply | 1 year |
CON/220 | Supply/Delivery of Quarry Products and Road Making Materials | 26/6/19 | F & T Concrete Pty Ltd | Annual Supply | 1 year |
CON/220 | Supply/Delivery of Quarry Products and Road Making Materials | 26/6/19 | Dermelo Contractors | Annual Supply | 1 year |
CON/220 | Supply/Delivery of Quarry Products and Road Making Materials | 26/6/19 | David Harris Earthmoving | Annual Supply | 1 year |
CON/220 | Supply/Delivery of Quarry Products and Road Making Materials | 26/6/19 | Casicar Pty Ltd | Annual Supply | 1 year |
CON/220 | Supply/Delivery of Quarry Products and Road Making Materials | 26/6/19 | BJ's Earthmoving | Annual Supply | 1 year |
CON/220 | Supply/Delivery of Quarry Products and Road Making Materials | 26/6/19 | Allens Contracting | Annual Supply | 1 year |
CON/219 | Plant Hire and Cartage Contractors | 26/6/19 | Hiway Stabilisers | Annual Supply | 1 year |
CON/219 | Plant Hire and Cartage Contractors | 26/6/19 | Bitu-Mill | Annual Supply | 1 year |
CON/219 | Plant Hire and Cartage Contractors | 26/6/19 | Landshape | Annual Supply | 1 year |
CON/219 | Plant Hire and Cartage Contractors | 26/6/19 | Sure Contruction | Annual Supply | 1 year |
CON/219 | Plant Hire and Cartage Contractors | 26/6/19 | S & D Paterson | Annual Supply | 1 year |
CON/219 | Plant Hire and Cartage Contractors | 26/6/19 | S & LM Riley | Annual Supply | 1 year |
CON/219 | Plant Hire and Cartage Contractors | 26/6/19 | Gippy Earthworks | Annual Supply | 1 year |
CON/219 | Plant Hire and Cartage Contractors | 26/6/19 | Envirogain | Annual Supply | 1 year |
CON/219 | Plant Hire and Cartage Contractors | 26/6/19 | Roger G Bailey | Annual Supply | 1 year |
CON/219 | Plant Hire and Cartage Contractors | 26/6/19 | Hughes Plant | Annual Supply | 1 year |
CON/219 | Plant Hire and Cartage Contractors | 26/6/19 | Ross Chapman | Annual Supply | 1 year |
CON/219 | Plant Hire and Cartage Contractors | 26/6/19 | Fowlers Ashphalting | Annual Supply | 1 year |
CON/219 | Plant Hire and Cartage Contractors | 26/6/19 | JT Earthmoving | Annual Supply | 1 year |
CON/219 | Plant Hire and Cartage Contractors | 26/6/19 | Demerlo Contractors | Annual Supply | 1 year |
CON/219 | Plant Hire and Cartage Contractors | 26/6/19 | Russeel Ian Hinds | Annual Supply | 1 year |
CON/219 | Plant Hire and Cartage Contractors | 26/6/19 | C & D Earthworks | Annual Supply | 1 year |
CON/219 | Plant Hire and Cartage Contractors | 26/6/19 | Ecoprojects | Annual Supply | 1 year |
CON/219 | Plant Hire and Cartage Contractors | 26/6/19 | Goldsmith Civil | Annual Supply | 1 year |
CON/219 | Plant Hire and Cartage Contractors | 26/6/19 | Forrester Haulage | Annual Supply | 1 year |
CON/219 | Plant Hire and Cartage Contractors | 26/6/19 | BJ Earthmoving | Annual Supply | 1 year |
CON/219 | Plant Hire and Cartage Contractors | 26/6/19 | Allens Contracting | Annual Supply | 1 year |
CON/219 | Plant Hire and Cartage Contractors | 26/6/19 | Beyer Contractors | Annual Supply | 1 years |
CON/217 | Supply and Delivery of Cold Liquid Bituminous Products | 26/6/19 | Downer EDI Works Pty Ltd | Annual Supply | 3 years |
CON/216 | Provision of Line Marking Services | 26/6/19 | Laser Line Marking Pty Ltd | Annual Supply | 3 years |
CON/215 | Building Maintenance Services and Essential Safety Services Inspections and Maintenance | 29/5/19 | Walker Electrical Contracting Pty Ltd | Annual Supply | 3 years |
CON/213 | Loch Streetscape – Victoria Road Reconstruction | 22/3/19 | Hugh Patrick Pty Ltd | $634,802.79 | 20 weeks |
CON/211 | Geotechnical Investigation and Gravel Depth Survey | 4/4/19 | SMEC | $175,363.65 | 12 weeks |
CON/208 | Supply and Construction of Sheds at 5 Transfer Stations | 27/2/19 | Hugh Patrick Pty Ltd | $463,320.00 | 2 months |
CON/207 | Design and Construct Toilet Blocks at Mirboo North and Korumburra | 20/5/19 | ASCO Group Pty Ltd | $85,969.81 | 36 weeks |
CON/206A | Urban Street Reconstruction Works | 25/1/19 | Hugh Patrick Pty Ltd | $769,065.00 | 5 months |
CON/206B | Urban Street Reconstruction Works | 25/1/19 | South Gippsland Quarries Pty Ltd | $290,476.69 | 5 months |
CON/203 | Korumburra Rec Reserve Changerooms | 19/12/18 | Beachley Constructions Pty Ltd | $292,550.00 | 13 weeks |
CON/201-A | Worksite Traffic Management Services | 19/12/18 | Global Traffic | Annual Supply | 1 year |
CON/201-B | Altus Traffic Pty Ltd | ||||
CON/201-C | Momentum Traffic Control | ||||
CON/201-D | A Plus Traffic Management | ||||
CON/196 | Ruby Arawata Road Bridge | 19/12/18 | Jarvis Norwood Constructions Pty Ltd | $622,501.00 | 30 weeks |
CON/195 | Supply and Installation of new Caravan Park Amenities Blocks at Long Jetty and Waratah Bay | 19/12/18 | ASCO Group Pty Ltd | $737,150.10 | 17 weeks |
CON/194 | Gippsland Tracks and Trails Feasibility | 19/11/18 | TRCTourism | $90,090.00 | 34 weeks |
CON/192-A | Footpath Extension and Renewal Program (2018 / 2019) | 12/01/18 | M&M Paving | $212,860.64 | 6 months |
CON/192-B | 12/01/18 | Hugh Patrick Pty Ltd | $234,146.70 | 6 months | |
CON/191 | Provision of Bitumious Surfacing | 26/11/18 | Boral Resources | Schedule of Rates | 5 months |
CON/190 | Koonwarra Landfill Cell 3 Cap Construction - Auditing | 19/11/18 | GHD Pty Ltd | $104,296.65 | 6 months |
CON/189 | Konwarra Landfill Cell 3 Cap Construction | 28/11/18 | Goldsmith Civil and Environmental Pty Ltd | $818,138.43 | 4 months |
CON/188 | Supply and Install Guardrail - various locations (2018/2019) | 10/10/28 | GBM Contractors (VIC) Pty Ltd | $195,044.85 | 6 months |
CON/187 | Supply and Installation of MFDs with Ongoing Maintenance Agreement | 27/9/18 | Chris Humphrey Office National Pty Ltd | Monthly Service Fee | 3 year Initial 2 x 1 year extension |
CON/186 | Development of a master plan for the Korumburra Railway Station site and the design and documentation for the Community Hub on the Railway Station site | 10/10/18 | Francis-Jones Morehen Thorp Pty Ltd | $347,242.50 | |
CON/175 | Construction of New Netball Court, Lighting and Player's Shed - Fish Creek Football Netball Club | 29/6/18 | Considine & Johnston Pty Ltd | $288,916.06 | 16 weeks |
CON/177-A | Annual Supply of Plant Hire and Cartage Contractors | 29/6/18 | Ecoprojects Australia Pty Ltd | Annual Supply | 1 year |
CON/177-B | Annual Supply of Plant Hire and Cartage Contractors | 29/6/18 | Beyer Contractors Pty Ltd | Annual Supply | 1 year |
CON/177-C | Annual Supply of Plant Hire and Cartage Contractors | 29/6/18 | Envirogain Pty Ltd | Annual Supply | 1 year |
CON/177-D | Annual Supply of Plant Hire and Cartage Contractors | 29/6/18 | Forrester & Co Pty Ltd | Annual Supply | 1 year |
CON/177-E | Annual Supply of Plant Hire and Cartage Contractors | 29/6/18 | Goldsmith Civil & Environmental Pty Ltd | Annual Supply | 1 year |
CON/177-F | Annual Supply of Plant Hire and Cartage Contractors | 29/6/18 | JT Earthmoving Contractors Pty Ltd | Annual Supply | 1 year |
CON/177-G | Annual Supply of Plant Hire and Cartage Contractors | 29/6/18 | BJ's Earthmoving | Annual Supply | 1 year |
CON/177-H | Annual Supply of Plant Hire and Cartage Contractors | 29/6/18 | TJ & DA Williams | Annual Supply | 1 year |
CON/177-I | Annual Supply of Plant Hire and Cartage Contractors | 29/6/18 | KND Maintenance Pty Ltd ATF Williams Family Trust | Annual Supply | 1 year |
CON/177-J | Annual Supply of Plant Hire and Cartage Contractors | 29/6/18 | Russell Hinds | Annual Supply | 1 year |
CON/177-K | Annual Supply of Plant Hire and Cartage Contractors | 29/6/18 | Allens Contracting | Annual Supply | 1 year |
CON/177-L | Annual Supply of Plant Hire and Cartage Contractors | 29/6/18 | Fowlers Asphalting | Annual Supply | 1 year |
CON/178-A | Annual Supply of Quarry Products and Road Making Materials | 29/6/18 | Allens Contracting | Annual Supply | 1 year |
CON/178-B | Annual Supply of Quarry Products and Road Making Materials | 29/6/18 | South Gippsland Quarries Pty Ltd | Annual Supply | 1 year |
CON/178-C | Annual Supply of Quarry Products and Road Making Materials | 29/6/18 | Goldsmith Civil & Environmental | Annual Supply | 1 year |
CON/178-D | Annual Supply of Quarry Products and Road Making Materials | 29/6/18 | F & T Concrete Pty Ltd | Annual Supply | 1 year |
CON/178-E | Annual Supply of Quarry Products and Road Making Materials | 29/6/18 | Holcim (Aust) Pty Ltd | Annual Supply | 1 year |
CON/178-F | Annual Supply of Quarry Products and Road Making Materials | 29/6/18 | Demerlo Contractors | Annual Supply | 1 year |
CON/178-G | Annual Supply of Quarry Products and Road Making Materials | 29/6/18 | David Harris Earthmoving Pty Ltd | Annual Supply | 1 year |
CON/178-H | Annual Supply of Quarry Products and Road Making Materials | 29/6/18 | K & RJ Mathews Quarries Pty Ltd | Annual Supply | 1 year |
CON/178-I | Annual Supply of Quarry Products and Road Making Materials | 29/6/18 | Casacir Pty Ltd trading as Neerim North Quarry | Annual Supply | 1 year |
CON/178-J | Annual Supply of Quarry Products and Road Making Materials | 29/6/18 | Kennedy Haulage Pty Ltd | Annual Supply | 1 year |
CON/180 | Toora Swimming Pool – Amenities Upgrade Stage 1 | 29/6/18 | Considine & Johnston Pty Ltd | $407,382.00 | 12 weeks |